230kV Gateway West Transmission Line

PacifiCorp Gateway West is a 115 mile long, 230kV single circuit line between Windstar and Shirley Basin substations.

INNOV8 POWER SOLUTIONS and its partners Implosive Sleeves Corp. and  Industrias ARRUTI have been selected by FB Titan and Domino Highvoltage to supply the following:

  • hardware and fittings for insulator strings, OPGW, and ground wire.

  • Stockbridge dampers and spacers.

  • Implosive dead-ends, midspan jointed jumper terminals for phase conductors and shield wire.

Materials have been delivered in 2023.